当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:做好冬期施工混凝土、砂浆及掺外加剂的试配试验工作,提出施工配合比。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
做好冬期施工混凝土、砂浆及掺外加剂的试配试验工作,提出施工配合比。
问题补充:

  • 匿名
2013-05-23 12:21:38
Good winter construction of concrete, mortar and mixed with the additives of the test trials, proposed the construction mix.
  • 匿名
2013-05-23 12:23:18
To do a good job for winter construction concrete, mortar and mixed with the admixture test placing pilot work, construction work than.
  • 匿名
2013-05-23 12:24:58
Completes the winter time construction concrete, the mortar and mixes the admixture to try to match the test work, proposes the construction mixture ratio.
  • 匿名
2013-05-23 12:26:38
Winter construction of concrete, mortar and distribution test of mixed with additives, proposed construction mixture ratio.
  • 匿名
2013-05-23 12:28:18
Good winter construction of concrete, mortar and mixed with the additives of the test trials, proposed the construction mix.
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭