当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:货到港以后,你是连同箱子一起送到工厂的,卸货以后再还箱子的,还是货先卸下来,然后安排拖车送到工厂的,因为国外BOEING现在反应货的外包装有点发霉,并且外部包装两边有翘起是什么意思?

待解决 悬赏分:1 - 离问题结束还有
货到港以后,你是连同箱子一起送到工厂的,卸货以后再还箱子的,还是货先卸下来,然后安排拖车送到工厂的,因为国外BOEING现在反应货的外包装有点发霉,并且外部包装两边有翘起
问题补充:

  • 匿名
2013-05-23 12:21:38
After the goods to Hong Kong, you are sent together with a box factory, later still unloading boxes, or goods should be removed first, then arrange the trailer to the plant, because of foreign goods in the packaging reaction BOEING now a bit moldy, and the external Packaging tilt on both sides
  • 匿名
2013-05-23 12:23:18
After that you are shipping to Hong Kong together with a box sent to the factory, after unloading the boxes, and then also to unload cargo first, and then arrange for towing BOEING factories abroad now, because the response of the packing volume is a bit stale, and external packaging on either side
  • 匿名
2013-05-23 12:24:58
After delivery port, you are deliver the factory together together with the box, will unload cargo the later again also box, the goods will unload first down, then will arrange the trailer to deliver the factory, because overseas BOEING responded now the goods the outside wrapping will be a little m
  • 匿名
2013-05-23 12:26:38
Cargo after arrival, you are sent to the factory along with the box, later also boxes of discharge, is total, the first being removed, then scheduled for trailers delivered to factories, because foreign BOEING outer packing of domestic reaction is a bit stale now, and an external package on both sid
  • 匿名
2013-05-23 12:28:18
After the goods to Hong Kong, you are sent together with a box factory, later still unloading boxes, or goods should be removed first, then arrange the trailer to the plant, because of foreign goods in the packaging reaction BOEING now a bit moldy, and the external Packaging tilt on both sides
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭