当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:在进入生产运行时由设备制造家派出电器和机械专业技术人员各1名来现场作质量保证,时间为3-5天(食宿费由设备制造家自理)。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
在进入生产运行时由设备制造家派出电器和机械专业技术人员各1名来现场作质量保证,时间为3-5天(食宿费由设备制造家自理)。
问题补充:

  • 匿名
2013-05-23 12:21:38
Into the production run time sent by the device maker, electrical and mechanical technicians to the scene of a guarantee for quality, time of 3-5 days (room and board at home take care of themselves by the device manufacturer).
  • 匿名
2013-05-23 12:23:18
In entered the production equipment manufactured home run-time by sending electrical and mechanical engineers to 1 for each site for quality assurance, and time is 3 - 5 days (accommodation and food manufacturing companies by the equipment expense).
  • 匿名
2013-05-23 12:24:58
When enters the production movement sends out the electric appliance and machinery professionals each 1 by the equipment manufacture comes the scene to make the quality assurance, the time is 3-5 day (food lodging allowance takes care of oneself by equipment manufacture).
  • 匿名
2013-05-23 12:26:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭