当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The stadium was designed for use throughout the 2008 Summer Olympics and Paralympics. Located in the Olympic Green, the $423 million stadium is the world's largest steel structure. The design was awarded to a submission from the Swiss architecture firm Herzog & de Meuron in April 2003, after a bidding process that incl是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The stadium was designed for use throughout the 2008 Summer Olympics and Paralympics. Located in the Olympic Green, the $423 million stadium is the world's largest steel structure. The design was awarded to a submission from the Swiss architecture firm Herzog & de Meuron in April 2003, after a bidding process that incl
问题补充:

  • 匿名
2013-05-23 12:21:38
体育场被设计为整个2008年夏季奥运会和残奥会使用。坐落在奥林匹克公园内,4.23亿美元的体育场是世界上最大的钢铁结构。该设计被授予由瑞士建筑事务所赫尔佐格和德梅隆在2003年4月提交的意见书后,投标过程,其中包括13最后意见。
  • 匿名
2013-05-23 12:23:18
大球场的设计,使用在整个2008年夏季奥运会和残奥会。 在奥林匹克公园,4.23亿元大球场是全球最大的钢铁结构。 提交的设计是颁发给一个在瑞士建筑公司赫尔佐克和德梅乌龙在2003年4月之后,一个投标程序,包括13个最后意见。
  • 匿名
2013-05-23 12:24:58
体育场设计为使用在2008夏季奥运会和Paralympics中。 位于奥林匹克绿色, $423百万体育场是世界的最大的钢结构。 设计在2003年4月被授予了一项提议从瑞士建筑学企业Herzog & de Meuron,在包括13项最后的提议的一个出价过程以后。
  • 匿名
2013-05-23 12:26:38
大球场被设计为在整个 2008 年夏季奥运会和残奥会使用。美元 42300 万体育场位于奥林匹克公园,是世界上最大的钢结构。设计 2003 年 4 月,包括 13 最终提交的投标过程完成后从瑞士建筑公司赫佐格 & 德默隆提交荣获。
  • 匿名
2013-05-23 12:28:18
大球场被设计为在整个 2008 年夏季奥运会和残奥会使用。美元 42300 万体育场位于奥林匹克公园,是世界上最大的钢结构。设计 2003 年 4 月,包括 13 最终提交的投标过程完成后从瑞士建筑公司赫佐格 & 德默隆提交荣获。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭