当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:钢筋网的绑扎。四周两行钢筋交叉点应每点扎牢,中间部分交叉点可相隔交错扎牢,但必须保证受力钢筋不位移。双向主筋和钢筋网,则须将全部钢筋相交点扎牢。绑扎时应注意相邻绑扎点的铁丝扣要成八字形,以免网片歪斜变形。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
钢筋网的绑扎。四周两行钢筋交叉点应每点扎牢,中间部分交叉点可相隔交错扎牢,但必须保证受力钢筋不位移。双向主筋和钢筋网,则须将全部钢筋相交点扎牢。绑扎时应注意相邻绑扎点的铁丝扣要成八字形,以免网片歪斜变形。
问题补充:

  • 匿名
2013-05-23 12:21:38
Steel mesh banding. Four weeks should be the intersection of two lines of steel fasten each point, the middle part of the crossover point can be separated by cross fasten, but must ensure that no displacement of the reinforced. Two-way steel mesh reinforcement and are required to fasten all reinforc
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
Mat reinforcement binding.All around two line of steel bar intersections should select every time grip the jail, the middle partial intersections may be separated by interlock grip the jail, but must guarantee the working reinforcement does not move.Bidirectional main reinforcement and mat reinforce
  • 匿名
2013-05-23 12:26:38
Steel bar mesh binding. Around two lines of intersection of reinforcement should be tied in prison, middle section crossing point can be staggered away tie in prison, but must be guaranteed effective bar displacement. Bi-directional main reinforcement and steel bar mesh, all reinforced point of inte
  • 匿名
2013-05-23 12:28:18
Steel mesh banding. Four weeks should be the intersection of two lines of steel fasten each point, the middle part of the crossover point can be separated by cross fasten, but must ensure that no displacement of the reinforced. Two-way steel mesh reinforcement and are required to fasten all reinforc
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭