当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:指出了强、弱电系统安装中质量监拉的关键环节,分析了关键环节的施工组织协调方法和安装质量监控步骤是什么意思?

待解决 悬赏分:1 - 离问题结束还有
指出了强、弱电系统安装中质量监拉的关键环节,分析了关键环节的施工组织协调方法和安装质量监控步骤
问题补充:

  • 匿名
2013-05-23 12:21:38
Pointed out the strong, weak quality monitoring system installed in the key drawing, analysis of the key methods of organization and coordination of construction and installation of quality control procedures
  • 匿名
2013-05-23 12:23:18
pointed out the strong and weak electricity system installation in the crucial link quality monitoring, analysis, and organizing and coordinating the key methods of construction and installation quality control steps
  • 匿名
2013-05-23 12:24:58
Had pointed out strong, in the weak electricity system installment the quality jail pulls the key link, analyzed the key link construction organization to coordinate method and the installment quality monitoring step
  • 匿名
2013-05-23 12:26:38
Pointed out the strong and weak electricity system installed in the key links of quality supervision, analysis of the key links of construction organization method for coordination and installation quality control steps
  • 匿名
2013-05-23 12:28:18
Pointed out the strong, weak quality monitoring system installed in the key drawing, analysis of the key methods of organization and coordination of construction and installation of quality control procedures
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭