当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:注意钢筋接头位置及锚固长度,特别是通长筋的接头位置,绑扎接头的搭接长度,应符合设计要求,在搭接长度内应绑扎三点是什么意思?

待解决 悬赏分:1 - 离问题结束还有
注意钢筋接头位置及锚固长度,特别是通长筋的接头位置,绑扎接头的搭接长度,应符合设计要求,在搭接长度内应绑扎三点
问题补充:

  • 匿名
2013-05-23 12:21:38
Note the location and anchorage length steel joints, in particular through long tendons of the joint position, joint banding lap length shall meet the design requirements, the length should be in the lap banding three o'clock
  • 匿名
2013-05-23 12:23:18
Steel balusters attention position and length, and in particular the length of the tendon position tied connections, the length, should conform to the design requirements in the erection, the length should be tied 3 points
  • 匿名
2013-05-23 12:24:58
Pays attention to the steel bar connector location and the anchor length, specially passes the long muscle the connector location, binds the attachment the lap of splice, should conform to the design requirement, binds three in the lap of splice planted agent
  • 匿名
2013-05-23 12:26:38
Note header location and anchorage length of reinforcement, especially through long reinforced connector locations, binding joints of lap length should be in line with design requirements, lap length binding within three
  • 匿名
2013-05-23 12:28:18
Note the location and anchorage length steel joints, in particular through long tendons of the joint position, joint banding lap length shall meet the design requirements, in three-point lap length should be banding
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭