当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:安装前,必须先将连杆收回到极限位置,收回时保证连杆不被卡死。然后用手旋转连杆向放出的方向旋转几圈。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
安装前,必须先将连杆收回到极限位置,收回时保证连杆不被卡死。然后用手旋转连杆向放出的方向旋转几圈。
问题补充:

  • 匿名
2013-05-23 12:21:38
Before installation, you must first rod retracts the limit position, ensure the link is not recovered when stuck. Then rotate the rod by hand to release the direction of the rotation a few times.
  • 匿名
2013-05-23 12:23:18
Before you install, you must first be recovered fusible links to the limit location, recovery guarantee when connecting rods were not. And then a hand Rotary minimizes the rotating it to release several laps.
  • 匿名
2013-05-23 12:24:58
Before the installment, must to the limit limits the connecting rod reclamation the position, when the reclamation guarantee first the connecting rod not by the deactivation.Then to the direction which emits revolves several with the hand revolving connecting rod.
  • 匿名
2013-05-23 12:26:38
Before installation, you must first link to recover to the extreme position, when recovery guarantee-link not to be stuck. Then rotate the direction of rotation of the connecting rods to the release by hand few times.
  • 匿名
2013-05-23 12:28:18
Before installation, you must first rod retracts the limit position, ensure the link is not recovered when stuck. Then rotate the rod by hand to release the direction of the rotation a few times.
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭