当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:材料验收,人员分配,库存检验,预算材料造价。材料数量,工艺属性进行了解。防止原材料浪费。确保材料充足。保持施工现场形象,检查消防系统是否合格。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
材料验收,人员分配,库存检验,预算材料造价。材料数量,工艺属性进行了解。防止原材料浪费。确保材料充足。保持施工现场形象,检查消防系统是否合格。
问题补充:

  • 匿名
2013-05-23 12:21:38
Material acceptance, staff assignments, inventory check, budget material costs. Quantity of material, process attributes to understand. To prevent the waste of raw materials. To ensure sufficient material. To maintain the image of the construction site to check whether the qualified fire protection
  • 匿名
2013-05-23 12:23:18
Materials and acceptance testing, personnel, budget allocation, material inventory costs. volume of material properties, and processes for understanding. Raw material waste prevention. Ensure adequate material. Keep construction site inspection of fire, whether the system image qualified.
  • 匿名
2013-05-23 12:24:58
Acceptance of materials, allotment of personnel, inventory check, budget material construction cost.Material quantity, the craft attribute carries on the understanding.Prevents raw material waste.Guarantees the material to be sufficient.Maintenance job location image, inspection fire prevention syst
  • 匿名
2013-05-23 12:26:38
Acceptance of materials, staffing, inventory check, budgeted material costs. Material number, process property to get an idea. Prevent waste of raw materials. Ensure adequate material. Keeping the construction site image, check the eligibility of fire control system.
  • 匿名
2013-05-23 12:28:18
null
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭