当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:吊起胶球循环泵,把地脚螺栓穿过泵的台板孔中悬挂,然后在基础上就位,使地脚螺栓放入基础的孔中并自由悬挂,这样可以在二次灌浆后稍微一动一下;是什么意思?

待解决 悬赏分:1 - 离问题结束还有
吊起胶球循环泵,把地脚螺栓穿过泵的台板孔中悬挂,然后在基础上就位,使地脚螺栓放入基础的孔中并自由悬挂,这样可以在二次灌浆后稍微一动一下;
问题补充:

  • 匿名
2013-05-23 12:21:38
Lift rubber ball circulation pump, the anchor bolts through the holes in the platen pump suspension, and then based on the place, so that anchor bolts into the foundation hole and free-hanging, so after a little filling in the second a move about;
  • 匿名
2013-05-23 12:23:18
crane revolving pump, plastic ball Foot screws are crossed to pump the countertops hoisted in the hole, and then the basis and to make on foot screws are placed in the foundations of freedom and in the hole, so that it can be hoisted on 2 occasions after grouting, slightly;
  • 匿名
2013-05-23 12:24:58
Slings the rubber ball circulating pump, is hanging in the place foot bolt traversing pump platen hole, then takes place in the foundation, causes the foot bolt to put in the foundation in the hole and the free hand, as soon as like this may move slightly after two grouting;
  • 匿名
2013-05-23 12:26:38
Lifting ball circulation pump, pump foundation bolts through the plate hole hanging, then place on the basis, the anchor bolts into the holes in the base and free hanging, this little move after the second Grouting;
  • 匿名
2013-05-23 12:28:18
Lifting ball circulation pump, pump foundation bolts through the plate hole hanging, then place on the basis, the anchor bolts into the holes in the base and free hanging, this little move after the second Grouting;
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭