当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:In cases where there is a disruption to the continuity of the wires in the percutaneous lead, damage may occur to the System Controller. Should damage to the System Controller occur and the Controller require changing, consideration should be given to supporting the patient with batteries, rather than the Power Module是什么意思?

待解决 悬赏分:1 - 离问题结束还有
In cases where there is a disruption to the continuity of the wires in the percutaneous lead, damage may occur to the System Controller. Should damage to the System Controller occur and the Controller require changing, consideration should be given to supporting the patient with batteries, rather than the Power Module
问题补充:

  • 匿名
2013-05-23 12:21:38
在经皮导致电线的连续性中断的情况下,有可能损坏系统控制器。应损害发生系统控制器,控制器需要改变时,应考虑给予支持,而不是用电池的电源模块(PM)的病人,因为这将减少可能破坏系统控制器。
  • 匿名
2013-05-23 12:23:18
在一些情况下,也存在一种中断的连续性,电线在经皮领导,损害可能会对系统控制器。 应以损害的系统控制器和该控制器需要改变发生,应该考虑支持与电池的病人,而不是在功率模块(下午),因为这将减少潜在的破坏系统控制器。
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
在案件中如有电线的经皮领先的业务连续性中断,损坏到系统控制器。应该向系统控制器损坏发生和控制器需要更改,应考虑到支持电池,而不是电源模块 (PM) 患者,这将减少破坏系统控制器的潜力。
  • 匿名
2013-05-23 12:28:18
在经皮导致电线的连续性中断的情况下,有可能损坏系统控制器。应损害发生系统控制器,控制器需要改变时,应考虑给予支持,而不是用电池的电源模块(PM)的病人,因为这将减少可能破坏系统控制器。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭