求翻译:在轨道上露天作业的起重机,当工作结束时,应将起重机锚锁定;当风力大于6级时,一般停止工作,并将起重机锚锁定。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
在轨道上露天作业的起重机,当工作结束时,应将起重机锚锁定;当风力大于6级时,一般停止工作,并将起重机锚锁定。
问题补充:

  • 匿名
2013-05-23 12:21:38
In the open-air operation of the crane on the track, when the working end of the crane should be the anchor lock; when the wind is greater than 6, generally stop working and lock anchor crane.
  • 匿名
2013-05-23 12:23:18
in orbit, an open-air operations at the end of the work when the crane, cranes, and should be locked at anchor; when wind more than 6 level, when the general cessation of work at anchor, and Cranes will be locked.
  • 匿名
2013-05-23 12:24:58
On track open-air work hoist crane, when end of job, should hoist crane anchor locking; When the wind power is bigger than 6 levels, general knock off, and hoist crane anchor locking.
  • 匿名
2013-05-23 12:26:38
Crane operating in orbit open-air, when at the end, crane anchor should be locked; when wind is greater than 6 level, the General stopped working, and crane bolt lock.
  • 匿名
2013-05-23 12:28:18
Crane operating in orbit open-air, when at the end, crane anchor should be locked; when wind is greater than 6 level, the General stopped working, and crane bolt lock.
 
 