当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:)面砖的铺贴工作,应在砂浆凝结前完成。铺贴时,要求面砖平整,镶嵌正确。施工间歇后继续铺贴前,应将已铺贴的花砖挤出的水泥混合砂浆予以清除。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
)面砖的铺贴工作,应在砂浆凝结前完成。铺贴时,要求面砖平整,镶嵌正确。施工间歇后继续铺贴前,应将已铺贴的花砖挤出的水泥混合砂浆予以清除。
问题补充:

  • 匿名
2013-05-23 12:21:38
) Brick paving work should be completed before condensation in the mortar. Stones, requirements flat tile, mosaic correct. Construction continued intermittently after the Stones before, paving the tiles should have been out of cement mortar to be removed.
  • 匿名
2013-05-23 12:23:18
) The shop tile stickers work, should be completed before the mortar condensation. When asked, stick tile mosaic formation, correct. Construction continued intermittently after shop should be posted before the flowers have been paved and stuck brick extrusion cement mixture mortar be removed.
  • 匿名
2013-05-23 12:24:58
Is depending on the wall place
  • 匿名
2013-05-23 12:26:38
) Brick paving work should be completed before the mortar condensation. When paving, requiring tile flat, mosaic is correct. Construction before the batch to continue paving, paving bricks should be extruded cement mortar to clear.
  • 匿名
2013-05-23 12:28:18
) Brick paving work should be completed before condensation in the mortar. Stones, requirements flat tile, mosaic correct. Construction continued intermittently after the Stones before, paving the tiles should have been out of cement mortar to be removed.
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭