当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Finding: Factory had taken few measures to ensure raw materials conform to required specification before use. For example, IQC inspector just checked the color and quantity for the cloth materials, but there was no cloth inspection machine to inspect the quality of cloth and the actual unit weight wasn't inspected.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Finding: Factory had taken few measures to ensure raw materials conform to required specification before use. For example, IQC inspector just checked the color and quantity for the cloth materials, but there was no cloth inspection machine to inspect the quality of cloth and the actual unit weight wasn't inspected.
问题补充:

  • 匿名
2013-05-23 12:21:38
发现:工厂采取了一些措施,以确保原材料符合规格要求,使用前。例如,IQC督察检查布料的颜色和数量,但有没有验布机布和本单位的实际重量的质量检查是不是检查。
  • 匿名
2013-05-23 12:23:18
调查结果:工厂已采取几项措施,以确保原料符合所需规格才使用。 例如,刚才IQC督察检查的颜色和数量的面料,但没有布检验机,检查的质量的布和的实际单位重量不检查。
  • 匿名
2013-05-23 12:24:58
发现: 工厂采取了少量措施保证原材料依照必需的规格在用途之前。 例如, IQC审查员检查了颜色和数量布料材料,但没有检查布料的质量的布料检查机器,并且实际单位重量未被检查。
  • 匿名
2013-05-23 12:26:38
发现: 工厂已采取一些措施,以确保原料符合使用前需规范。例如,IQC 督察刚检查的颜色和数量布材料,但有没有布检验机布和实际单位重量的质量检查不检查。
  • 匿名
2013-05-23 12:28:18
发现:工厂采取了一些措施,以确保原材料符合规格要求,使用前。例如,IQC督察检查布料的颜色和数量,但有没有验布机布和本单位的实际重量的质量检查是不是检查。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭