当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:建设单位依据经批准的建筑设计方案做建筑工程施工图。施工图经建设部门审图中心审查后,报规划分局申请办理建设工程规划许可证。办证时,土地手续尚未办理完毕但已同意使用的,应由土地部门出具证明。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
建设单位依据经批准的建筑设计方案做建筑工程施工图。施工图经建设部门审图中心审查后,报规划分局申请办理建设工程规划许可证。办证时,土地手续尚未办理完毕但已同意使用的,应由土地部门出具证明。
问题补充:

  • 匿名
2013-05-23 12:21:38
Construction unit according to the approved architectural design in the building construction plans. Construction drawing plan approval by the central review of the construction sector, the report branches to apply for planning the construction project planning permit. Rush, land clearance has not y
  • 匿名
2013-05-23 12:23:18
construction based on the approved architectural design program to do construction work commencement. The construction sector working drawings, after review, the Map Center Planning Branch construction project planning application for permit. In the land registration procedures have not yet been com
  • 匿名
2013-05-23 12:24:58
The construction unit rests on by the authorized architectural design plan makes the architectural engineering construction drawing.The construction drawing after the construction department blueprint examination center examination, reports the plan sub-bureau to apply to handle the construction pro
  • 匿名
2013-05-23 12:26:38
Construction units based on the architectural design of building works approved construction plans. Construction drawing examination centre by the construction department investigations, the planning branch of the application for a planned construction project licenses. When land clearance has not b
  • 匿名
2013-05-23 12:28:18
Construction unit according to the approved architectural design in the building construction plans. Construction drawing plan approval by the central review of the construction sector, the report branches to apply for planning the construction project planning permit. Rush, land clearance has not y
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭