当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:在施工中临时用电设备发生故障,或更换电气设备,不得随意乱动,应请电工进行修理。移动非固定安装的电气设备,作业人员必须先切断电源。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
在施工中临时用电设备发生故障,或更换电气设备,不得随意乱动,应请电工进行修理。移动非固定安装的电气设备,作业人员必须先切断电源。
问题补充:

  • 匿名
2013-05-23 12:21:38
In the construction of temporary power equipment failure, or replacement of electrical equipment, are not free to tamper with, to be an electrician for repairs. Mobile non-fixed installation of electrical equipment, operating personnel must first cut off the power.
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
In the construction of temporary power supply equipment failure, or replacing electrical devices, not free to fiddle with, electrician should be asked to repair it. Moving non-permanently installed electrical equipment, workers must first cut off the power.
  • 匿名
2013-05-23 12:28:18
In the construction of temporary power supply equipment failure, or replacing electrical devices, not free to fiddle with, electrician should be asked to repair it. Moves not permanently installed electrical equipment, workers must power off.
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭