当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:但是我在检查时发现产品湿度过高(天气原因),配合第三方的验货时间,我们需要延迟包装产品,所以能否将船期推迟到18号以后是什么意思?

待解决 悬赏分:1 - 离问题结束还有
但是我在检查时发现产品湿度过高(天气原因),配合第三方的验货时间,我们需要延迟包装产品,所以能否将船期推迟到18号以后
问题补充:

  • 匿名
2013-05-23 12:21:38
But I checked and found the product humidity is too high (the weather), with third-party inspection time, we need to delay packaging products, so schedules can be delayed until after 18
  • 匿名
2013-05-23 12:23:18
But I at the time of the inspection found that product humidity too high (because of the weather, and tie in with the 3 Parties) the inspection of the products we need time, packaging products, they can delay will be postponed to the 18 boat period after No.
  • 匿名
2013-05-23 12:24:58
But I when inspection discovered the product humidity excessively is high (weather reason), the coordinate third party inspects goods the time, we need to retard the packing product, therefore whether will postpone the sailing time to 18 later
  • 匿名
2013-05-23 12:26:38
But when I check you find the humidity is too high (the weather), with third-party inspection time, we need to delay package product, so after going to be delayed while the 18th
  • 匿名
2013-05-23 12:28:18
But when I check you find the humidity is too high (the weather), with third-party inspection time, we need to delay package product, so after going to be delayed while the 18th
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭