求翻译:甲方提供上述协作事项的时间及方式:按双方的工作计划执行,若甲方不能及时提供全部评价所需资料、生产负荷不能满足评价需求及现场职业病防护设施达不到竣工验收要求,乙方提交成果的时间相应延期。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
甲方提供上述协作事项的时间及方式:按双方的工作计划执行,若甲方不能及时提供全部评价所需资料、生产负荷不能满足评价需求及现场职业病防护设施达不到竣工验收要求,乙方提交成果的时间相应延期。
问题补充:

  • 匿名
2013-05-23 12:21:38
Party to provide the time and manner of collaboration issues: implementation of the plan of work by both parties, if the Party does not promptly provide all information needed for the evaluation, production capacity can not meet demand and on-site evaluation of occupational protection requirements o
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
The party of the first part provides the above cooperation item the time and the way: According to bilateral work plan execution, if the party of the first part cannot promptly provide appraises completely needs the material, the production load cannot meet the appraisal need and the scene occupatio
  • 匿名
2013-05-23 12:26:38
Party a time and manner of such collaboration matters: according to the implementation of its programme of work between the two sides, if party a does not provide full assessment of the required information in a timely manner, the production load do not meet the assessment needs and occupational-dis
  • 匿名
2013-05-23 12:28:18
Party a time and manner of such collaboration matters: according to the implementation of its programme of work between the two sides, if party a does not provide full assessment of the required information in a timely manner, the production load do not meet the assessment needs and occupational-dis
 
 