当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:三峡右岸电站500KV开关站开关控制、现场数据采集、调度数据上送均由LCU33(右I)、LCU34(右II)控制器实现。右岸LCU的配置为热备用方式,因此,主备控制器的切换不会影响监控系统对右I(右II)开关站的控制与监视。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
三峡右岸电站500KV开关站开关控制、现场数据采集、调度数据上送均由LCU33(右I)、LCU34(右II)控制器实现。右岸LCU的配置为热备用方式,因此,主备控制器的切换不会影响监控系统对右I(右II)开关站的控制与监视。
问题补充:

  • 匿名
2013-05-23 12:21:38
Three Gorges Right Bank Power Station 500KV switching station switch control, field data collection, scheduling the data sent by the LCU33 (right-I), LCU34 (Right II) controllers. Right bank of the LCU's configured as a hot standby mode, so switching the standby controller does not affect the monito
  • 匿名
2013-05-23 12:23:18
Station 3 500 KV Drina Gorge switch control switching station, field data collection, scheduling data sent by LCU I), 33 (right LCU II 34 (right) controller. The Platte LCU configured with Hot Standby mode, and therefore the LORD a backup controller The switch will not affect control system in the r
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
Three Gorges right bank power station of 500KV switch station switches on a control, field data collection, scheduling, data sent by the LCU33 (right I), LCU34 (right II) controller. LCU configured as a hot spare on the right bank, therefore, primary controller switch does not affect the monitoring
  • 匿名
2013-05-23 12:28:18
Three Gorges right bank power station of 500KV switch station switches on a control, field data collection, scheduling, data sent by the LCU33 (right I), LCU34 (right II) controller. LCU configured as a hot spare on the right bank, therefore, primary controller switch does not affect the monitoring
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭