当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Draw up and perfect control plan and work instructions and so on,and to ensure their consistency with the site operation. And production-line station has successfully passed the company quality system audit;是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Draw up and perfect control plan and work instructions and so on,and to ensure their consistency with the site operation. And production-line station has successfully passed the company quality system audit;
问题补充:

  • 匿名
2013-05-23 12:21:38
制定和完善的控制计划和工作指导等,并确保与现场操作的一致性。和生产线站已顺利通过该公司的质量体系审核;
  • 匿名
2013-05-23 12:23:18
制定和完善管制计划和工作指示和等,以保证它们符合该站运作。 和生产网站已成功地通过了公司的质量系统审计;
  • 匿名
2013-05-23 12:24:58
Main study curriculum: Material study, mechanical drawing, mold processing craft, cold stamping craft and mold design, plastic formation craft and so on.Obtains UG rank certificate, the numerical control mill rank certificate.
  • 匿名
2013-05-23 12:26:38
制定和完善控制计划和工作说明,等等,并确保其网站操作的一致性。产线站成功地通过了公司质量体系审核 ;
  • 匿名
2013-05-23 12:28:18
制定和完善控制计划和工作说明,等等,并确保其网站操作的一致性。产线站成功地通过了公司质量体系审核 ;
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭