|
关注:1
2013-05-23 12:21
求翻译:4对照法。按照JGJ73-91和GBJ300-301的标准,根据施工项目的子项,对照逐一检查、评定,分别作出记录,留作档案。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
4对照法。按照JGJ73-91和GBJ300-301的标准,根据施工项目的子项,对照逐一检查、评定,分别作出记录,留作档案。
问题补充: |
|
2013-05-23 12:21:38
4-control method. According to JGJ73-91 and GBJ300-301 standard, according to the child of the construction project, were each inspection, evaluation, respectively, to record, reserved for the file.
|
|
2013-05-23 12:23:18
Law 4 contrast. In accordance with JGJ GBJ 73 - 91 and 300 - 301, in accordance with the standards of construction projects by checking all subkeys, in contrast, grading, respectively, are set aside to record files.
|
|
2013-05-23 12:24:58
4 pairs according to direction.According to JGJ73-91 and the GBJ300-301 standard, according to the construction project numerator, the comparison inspects, the evaluation one by one, makes the record separately, remains makes the file.
|
|
2013-05-23 12:26:38
4-control method. In accordance with the standards of JGJ73-91 and GBJ300-301, based on a child of the construction project against each inspection, evaluation, separately recorded, retained as archives.
|
|
2013-05-23 12:28:18
4-control method. In accordance with the standards of JGJ73-91 and GBJ300-301, based on a child of the construction project against each inspection, evaluation, separately recorded, retained as archives.
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区