当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:由于在上弦杆中填充混凝土对钢管混凝土相对施工工作量较小且整体力学性能提高非常明显,是什么意思?

待解决 悬赏分:1 - 离问题结束还有
由于在上弦杆中填充混凝土对钢管混凝土相对施工工作量较小且整体力学性能提高非常明显,
问题补充:

  • 匿名
2013-05-23 12:21:38
As the top chord of steel filled with concrete in concrete construction work is relatively small and the overall mechanical performance is very obvious,
  • 匿名
2013-05-23 12:23:18
Because par in bend in the tube filled with concrete Concrete relative construction workload was relatively small and overall mechanical performance increase is very obvious.
  • 匿名
2013-05-23 12:24:58
Because fills the concrete in the top chord to be small to the steel pipe concrete relative construction work load also the overall mechanics performance enhances obviously extremely,
  • 匿名
2013-05-23 12:26:38
Due to the wind the rod to fill concrete in concrete-filled steel tubular construction work to smaller and overall mechanical behavior improved very significantly,
  • 匿名
2013-05-23 12:28:18
Due to the wind the rod to fill concrete in concrete-filled steel tubular construction work to smaller and overall mechanical behavior improved very significantly,
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭