当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:the requirement to build in excess of one million square feet in a short timescale suggested a high degree of prefabrication ,including factory-finished modules,while the need to build downwards and upwards simultaneously led to the adoption of a suspension structure, with pairs of steel masts arrang是什么意思?

待解决 悬赏分:1 - 离问题结束还有
the requirement to build in excess of one million square feet in a short timescale suggested a high degree of prefabrication ,including factory-finished modules,while the need to build downwards and upwards simultaneously led to the adoption of a suspension structure, with pairs of steel masts arrang
问题补充:

  • 匿名
2013-05-23 12:21:38
超过一百万平方英尺,在很短的时间尺度上建立的要求提出的预制高的程度,包括出厂成品模块,而需要建立向下,向上同时通过一个悬挂结构钢对,桅杆安排在三个海湾。
  • 匿名
2013-05-23 12:23:18
这项规定,建立在超过一个000平方呎的短时间内建议高度的预制组件,包括工厂制成品单元而需要建立向下调高,同时,通过了一项暂停结构,对钢铁桅杆安排在三个避车处。
  • 匿名
2013-05-23 12:24:58
要求修造超出一百万平方英尺在一个短的时标建议了高度 预铸,包括工厂完成的模块,当需要修造向下和向上同时导致悬浮结构的采用,以被安排的对钢帆柱在三个海湾时。
  • 匿名
2013-05-23 12:26:38
生成的超过 100 万平方呎短时间刻度中的规定建议的预制,包括工厂完成的模块,而要向下和向上同时生成导致悬挂结构,通过对钢桅杆排列 3 个机架的高度。
  • 匿名
2013-05-23 12:28:18
生成的超过 100 万平方呎短时间刻度中的规定建议的预制,包括工厂完成的模块,而要向下和向上同时生成导致悬挂结构,通过对钢桅杆排列 3 个机架的高度。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭