当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:T梁采用与桥面板及横隔板连接的措施连成整体,在隔板处施加横向预应力。桥面俩侧设人行道,人行道角钢支座与预埋在挡碴墙处T型钢栓接。轨底至梁底建筑高度为3.4m。 本文结合工程实例分别从工作机理、施工流程、质量检验三个方面对T梁做了阐述。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
T梁采用与桥面板及横隔板连接的措施连成整体,在隔板处施加横向预应力。桥面俩侧设人行道,人行道角钢支座与预埋在挡碴墙处T型钢栓接。轨底至梁底建筑高度为3.4m。 本文结合工程实例分别从工作机理、施工流程、质量检验三个方面对T梁做了阐述。
问题补充:

  • 匿名
2013-05-23 12:21:38
T-beam bridge decks and the use of diaphragm and the measures connected together into a whole, put in the partition at the transverse prestressing. Both side of the bridge set up sidewalk, sidewalk bearing angle and embedded in ballast retaining wall at the T-beam bolted. Bottom rail to the beam at
  • 匿名
2013-05-23 12:23:18
Mr LEUNG used T with decks and transverse bulkhead connections linking the measures imposed on the whole, the divisions horizontal prestressed. both decks located adjacent sidewalks, sidewalks and pre-buried hexagonal steel bearings in the block wall street scum T dilatant bolted. beam bottom line b
  • 匿名
2013-05-23 12:24:58
T Liang uses with the floorboard and the cross spacer connection measure company becomes the whole, in partition board place infliction crosswise pre-stressed.The bridge floor pair side supposes the sidewalk, the sidewalk angle steel support with buries in advance is keeping off is cut by broken gla
  • 匿名
2013-05-23 12:26:38
T-beam bridge decks and diaphragm connected measures form a whole, of transverse prestress applied to separators. Both sides set the pavement of bridge deck, angle iron support and embedded in the sidewalk blocking t-shaped steel ballast wall to bolt. Flange to the end of beam building height of 3.4
  • 匿名
2013-05-23 12:28:18
T-beam bridge decks and diaphragm connected measures form a whole, of transverse prestress applied to separators. Both sides set the pavement of bridge deck, angle iron support and embedded in the sidewalk blocking t-shaped steel ballast wall to bolt. Flange to beam construction is 3.4m. Constructio
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭