求翻译:根据现场实际情况,主要集中打桩期间5台桩机施工用电, 基础及主体施工用电约为150KW。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
根据现场实际情况,主要集中打桩期间5台桩机施工用电, 基础及主体施工用电约为150KW。
问题补充:

  • 匿名
2013-05-23 12:21:38
According to the actual situation, mainly the construction pile driver pile driving during the five electricity, basic electricity and the main construction is about 150KW.
  • 匿名
2013-05-23 12:23:18
In accordance with the realities on the ground, the major focus during piling 5 pile foundation construction, electricity and main construction electricity KW approximately 150.
  • 匿名
2013-05-23 12:24:58
According to the scene actual situation, the main centralism cuts in line the period 5 pile machine constructions to use electricity, the foundation and the main body construction uses electricity is approximately 150KW.
  • 匿名
2013-05-23 12:26:38
According to the actual situation at the scene, 5 during the main set piling pile machine construction, base and subject construction about to 150KW.
  • 匿名
2013-05-23 12:28:18
According to the actual situation at the scene, 5 during the main set piling pile machine construction, base and subject construction about to 150KW.
 
 