当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:而施工中塑料排水板打入深浅影响了设计提出的预压时间,是什么意思?

待解决 悬赏分:1 - 离问题结束还有
而施工中塑料排水板打入深浅影响了设计提出的预压时间,
问题补充:

  • 匿名
2013-05-23 12:21:38
The construction of the plastic drain into the depth of the impact of the design of the pre-press time,
  • 匿名
2013-05-23 12:23:18
In the construction impact shallow plastic drainage board into the design of time pressure on early warning,
  • 匿名
2013-05-23 12:24:58
But constructed the plastic draining water board to infiltrate the depth to affect the precompression time which the design proposed,
  • 匿名
2013-05-23 12:26:38
Construction of plastic drainage plate into the depth affects the design of preload time
  • 匿名
2013-05-23 12:28:18
Construction of plastic drainage plate into the depth affects the design of preload time
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭