当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:吊空值的影响应尽量通过工程措施消除或减小其影响是什么意思?

待解决 悬赏分:1 - 离问题结束还有
吊空值的影响应尽量通过工程措施消除或减小其影响
问题补充:

  • 匿名
2013-05-23 12:21:38
Hanging null effects should be through engineering measures to eliminate or reduce its impact
  • 匿名
2013-05-23 12:23:18
Cable empty value impact should be possible, through engineering measures to eliminate or reduce its impact
  • 匿名
2013-05-23 12:24:58
Hangs the spatial value the influence to be supposed as far as possible to eliminate or to reduce its influence through the project measure
  • 匿名
2013-05-23 12:26:38
Lifting effect of null values as far as possible through engineering measures to eliminate or reduce its impact
  • 匿名
2013-05-23 12:28:18
Hanging null impact possible through engineering measures of elimination or decrease its impact
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭