当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:上海将建设一条全长33公里的磁悬浮铁路,连接浦东国际机场和龙阳路地铁站。这项工程将采用德国的技术。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
上海将建设一条全长33公里的磁悬浮铁路,连接浦东国际机场和龙阳路地铁站。这项工程将采用德国的技术。
问题补充:

  • 匿名
2013-05-23 12:21:38
Shanghai will build a total length of 33 km of magnetic levitation rail link from Pudong International Airport and Long Yang Road subway station. The project will use German technology.
  • 匿名
2013-05-23 12:23:18
Shanghai will be the construction of a 33 -kilometer maglev railway, connected to Pudong International Airport and Longyang Road metro station. This project will be using German technology.
  • 匿名
2013-05-23 12:24:58
Shanghai will construct span 33 kilometer magnetism aerosol railroads, will connect the Pudong international airport and Long Yanglu the underground station.This project will use Germany's technology.
  • 匿名
2013-05-23 12:26:38
Shanghai to build a 33-km magnetic suspension railway, connecting Pudong International Airport and long Yang Road MTR station. This project will be Germany's technology.
  • 匿名
2013-05-23 12:28:18
Shanghai to build a 33-km magnetic suspension railway, connecting Pudong International Airport and long Yang Road MTR station. This project will be Germany's technology.
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭