当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:10月6日将对全区室外消防栓进行冲洗放水工作是什么意思?

待解决 悬赏分:1 - 离问题结束还有
10月6日将对全区室外消防栓进行冲洗放水工作
问题补充:

  • 匿名
2013-05-23 12:21:38
October 6 will be flushing fire hydrants outside the region drainage work
  • 匿名
2013-05-23 12:23:18
On 6 October, outdoor fire hydrants throughout the region will be to work for flushing water
  • 匿名
2013-05-23 12:24:58
On October 6 will carry on the flushing to the entire area outdoor hose saddle to turn on the water the work
  • 匿名
2013-05-23 12:26:38
On October 6 on the region's outdoor fire hydrant flushing water work
  • 匿名
2013-05-23 12:28:18
On October 6 on the region's outdoor fire hydrant flushing water work
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭