求翻译:  7. 安装横向卡挡龙骨:根据设计要求,隔墙高度大于3m时应加横向卡档龙骨,采向抽心铆钉或螺栓固定。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
  7. 安装横向卡挡龙骨:根据设计要求,隔墙高度大于3m时应加横向卡档龙骨,采向抽心铆钉或螺栓固定。
问题补充:

  • 匿名
2013-05-23 12:21:38
7 card installed lateral keel block: according to design requirements, wall height greater than 3m should be added horizontal card file keel, taken to the pumping heart of rivets or bolts.
  • 匿名
2013-05-23 12:23:18
7.install horizontal card keel Block: According to the design requirements, the fence height greater than 3 m keel stalls be horizontal cards to random hearts, rivets or bolts fixed.
  • 匿名
2013-05-23 12:24:58
  7. Installs the crosswise card to keep off the keel: According to the design request, the partition wall is bigger than when highly 3m should add the crosswise card files keel, picks is fixed to the self-plugging rivet or the bolt.
  • 匿名
2013-05-23 12:26:38
  7. install the horizontal card retaining keel: based on the design requirements, wall height is greater than 3M should add lateral keel, mining extraction rivets or bolt.
  • 匿名
2013-05-23 12:28:18
  7. install the horizontal card retaining keel: based on the design requirements, wall height is greater than 3M should add lateral keel, mining extraction rivets or bolt.
 
 