求翻译:机器调试好后生产的第一个产品需给予首件IPQC检验,合格后方可生产,并将首件产品悬挂于生产现场。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
机器调试好后生产的第一个产品需给予首件IPQC检验,合格后方可生产,并将首件产品悬挂于生产现场。
问题补充:

  • 匿名
2013-05-23 12:21:38
After commissioning the machine the first manufactured products to be given first piece IPQC test, after passing the production, and first product hanging on the production site.
  • 匿名
2013-05-23 12:23:18
After Machine Debug better production of the first product to be given to first pass IPQC testing, production, and will be the first product hoisted in on-site production.
  • 匿名
2013-05-23 12:24:58
After the machine debugs the first product which produces to have to give the first IPQC examination, after the qualified side may produce, and is hanging the first product in produces the scene.
  • 匿名
2013-05-23 12:26:38
Machine debugging production after good first product you want to give first IPQC inspection, qualified before production, and the first product that hangs from the field.
  • 匿名
2013-05-23 12:28:18
Machine first product manufactured after the adjusting needed to give first IPQC inspection, after passing production, and first hoisted in production site.
 
 