当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:It is the contractor’s responsibility to carefully layout the works on site to conform to all architectural, structural, electrical and mechanical conditions and installations, to provide correct setting-out of all lines, to avoid all obstructions, to conform to details and instructions provided by material and equipme是什么意思?

待解决 悬赏分:1 - 离问题结束还有
It is the contractor’s responsibility to carefully layout the works on site to conform to all architectural, structural, electrical and mechanical conditions and installations, to provide correct setting-out of all lines, to avoid all obstructions, to conform to details and instructions provided by material and equipme
问题补充:

  • 匿名
2013-05-23 12:21:38
承包商的精心布置现场的作品,以符合所有建筑,结构,电气和机械的条件和设施,向正确的设置,出都行,避免任何物件阻碍,符合的细节,并提供指示材料和设备制造商。
  • 匿名
2013-05-23 12:23:18
它是承包商的责任,认真设计的工程地盘,以符合所有建筑、结构、电气和机械条件和设施,提供正确的设置的所有行,以避免所有障碍物,以符合详情及提供的指示材料和设备制造商。
  • 匿名
2013-05-23 12:24:58
仔细地是承包商的责任对布局在站点的工作依照所有建筑,结构,电,并且机械情况和设施,提供所有线正确展示,避免所有阻碍,依照材料和设备和指示提供的细节制造。
  • 匿名
2013-05-23 12:26:38
它是精心布局以符合所有的建筑、 结构、 电气和机械的条件和设施,提供正确的所有行,以避免所有的障碍,使其符合详细信息和提供的材料和设备制造商的说明放样工地工程承建商的责任。
  • 匿名
2013-05-23 12:28:18
它是精心布局以符合所有的建筑、 结构、 电气和机械的条件和设施,提供正确的所有行,以避免所有的障碍,使其符合详细信息和提供的材料和设备制造商的说明放样工地工程承建商的责任。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭