当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:在工程勘察、设计及施工阶段的纵向沉降均匀化控制措施是什么意思?

待解决 悬赏分:1 - 离问题结束还有
在工程勘察、设计及施工阶段的纵向沉降均匀化控制措施
问题补充:

  • 匿名
2013-05-23 12:21:38
In the engineering survey, design and construction phase of the longitudinal uniformity of deposition control measures
  • 匿名
2013-05-23 12:23:18
Investigate in the engineering,design and construction the stage lengthways sinks to decline even turn to control the measure
  • 匿名
2013-05-23 12:24:58
In project reconnaissance, design and construction stage longitudinal subsidence uniformization control measure
  • 匿名
2013-05-23 12:26:38
In engineering investigation, design and construction stages of vertical settlement of homogenization control
  • 匿名
2013-05-23 12:28:18
In engineering investigation, design and construction stages of vertical settlement of homogenization control
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭