当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:三层电工穿管布线,检查整改情况,已按要求整改完成。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
三层电工穿管布线,检查整改情况,已按要求整改完成。
问题补充:

  • 匿名
2013-05-23 12:21:38
Three electrical wiring through tube, check the rectification, the rectification has been completed as required.
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
Three electrician poling wiring, the inspection reorganizes the situation, has reorganized according to the request completes.
  • 匿名
2013-05-23 12:26:38
Three-layer electric pipe wiring, inspect the situation, had completed rectification and reform as requested.
  • 匿名
2013-05-23 12:28:18
Three-layer electric pipe wiring, inspect the situation, had completed rectification and reform as requested.
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭