当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:对压火时间长,料层温度低于700℃,料层厚度又超过500毫米时,应打开炉门,由冷渣管排除一部分底料,然后按点火启动方法操作,使锅炉转入正常运行是什么意思?

待解决 悬赏分:1 - 离问题结束还有
对压火时间长,料层温度低于700℃,料层厚度又超过500毫米时,应打开炉门,由冷渣管排除一部分底料,然后按点火启动方法操作,使锅炉转入正常运行
问题补充:

  • 匿名
2013-05-23 12:21:38
Fire for a long time on the pressure, the material layer temperature below 700 ℃, material thickness and more than 500 mm, the door should be open by the end of the cold slag control to exclude some material, then press the ignition to start the method of operation, the normal operation of the boile
  • 匿名
2013-05-23 12:23:18
Over a long period, and put pressure on the fire at temperatures below 700 level information, personal data layer thickness °C is over 500 mm, open door, should be part of a cold end exclusion Standard Chartered management information, and then set fire to the boiler operation boot method into norma
  • 匿名
2013-05-23 12:24:58
To presses the fire time to be long, expects the level temperature to be lower than 700℃, expects when level thickness surpasses 500 millimeters, should open the fire door, the tube removes part of bed charge by Leng Zha, then according to the ignition start method operation, causes the boiler to re
  • 匿名
2013-05-23 12:26:38
On the Bank a long time, material layer temperature less than 700 ° c, the material layer thickness and more than 500 mm, should open the door, by the end of slag cooling tube part excluded, and then follow the ignition to start operation, normal operation of the boiler
  • 匿名
2013-05-23 12:28:18
On the Bank a long time, material layer temperature less than 700 ° c, the material layer thickness and more than 500 mm, should open the door, by the end of slag cooling tube part excluded, and then follow the ignition to start operation, normal operation of the boiler
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭