当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:USFilter personnel have the primary responsibility for the physical execution of the FAT protocol for the USP Purified Water System including collecting the test data, signing off the test data sheets and analysis of the testing results. Customer personnel or their designated representatives may perform o是什么意思?

待解决 悬赏分:1 - 离问题结束还有
USFilter personnel have the primary responsibility for the physical execution of the FAT protocol for the USP Purified Water System including collecting the test data, signing off the test data sheets and analysis of the testing results. Customer personnel or their designated representatives may perform o
问题补充:

  • 匿名
2013-05-23 12:21:38
美净人员USP纯化水系统,包括采集测试数据,签署了测试数据表和测试结果的分析发协议的物理执行的主要责任。客户人员或者其指定的代表可能执行或协助这些任务与美净人员的指导下,在发执行。
  • 匿名
2013-05-23 12:23:18
USFilter收购了Plymouth产品公司人员有主要的责任,执行的身体脂肪的议定书》USP纯净水系统包括收集的测试数据,签署过的测试数据表和分析的测试结果。 客户人员或其指定的代表可执行或协助执行在这些任务在发的指导下USFilter收购了Plymouth产品公司的人员。
  • 匿名
2013-05-23 12:24:58
USFilter人员有对肥胖协议的物理施行的主要责任为USP被净化的供水系统包括收集测验数据,签字对测试结果的测验数据板料和分析。 顾客人员或他们选定的代表也许执行或协助这些任务中肥胖施行,以USFilter人员教导。
  • 匿名
2013-05-23 12:26:38
USFilter 人员拥有物理执行议定书 》 脂肪的 USP 纯净水系统包括收集的测试数据、 签收的测试数据纸及测试结果分析的主要责任。客户的人员或其指定的代表可执行或脂肪执行期间,USFilter 人员的指导下,协助这些任务。
  • 匿名
2013-05-23 12:28:18
USFilter 人员拥有物理执行议定书 》 脂肪的 USP 纯净水系统包括收集的测试数据、 签收的测试数据纸及测试结果分析的主要责任。客户的人员或其指定的代表可执行或脂肪执行期间,USFilter 人员的指导下,协助这些任务。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭