当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Establish the friction and wear lab equipment, including introduction and plant construction. Responsible for the investigation of the equipment manufacturer, the technical agreement, the writing of the project bidding, design and manufacturing process tracking equipment acceptance, laboratory, plant construction, etc.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Establish the friction and wear lab equipment, including introduction and plant construction. Responsible for the investigation of the equipment manufacturer, the technical agreement, the writing of the project bidding, design and manufacturing process tracking equipment acceptance, laboratory, plant construction, etc.
问题补充:

  • 匿名
2013-05-23 12:21:38
建立的摩擦磨损实验设备,包括引进和厂房建设。负责设备制造商的调查,技术合作协议,项目招投标,设计和制造过程跟踪设备验收,实验室,厂房建设,等书面
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
建立摩擦并且佩带实验室设备,包括介绍和工厂建造。 负责任对设备制造商、技术协议、文字项目出价,设计和制造过程跟踪的设备采纳、实验室、工厂建造等等的调查。
  • 匿名
2013-05-23 12:26:38
建立摩擦和磨损实验室设备,包括介绍和工厂建设。负责调查的工程招投标、 设计和制造过程跟踪设备验收、 实验室、 厂房建设,写作技术协议,设备制造商等。
  • 匿名
2013-05-23 12:28:18
建立摩擦和磨损实验室设备,包括介绍和工厂建设。负责调查的工程招投标、 设计和制造过程跟踪设备验收、 实验室、 厂房建设,写作技术协议,设备制造商等。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭