当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:钢筋笼安装要认真对中,保证桩壁砼保护屋的厚度及钢筋笼标高符合设计要求。钢筋笼安装完毕,进行二次清孔。清孔后泥浆性能指针报现场监理工程师验收。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
钢筋笼安装要认真对中,保证桩壁砼保护屋的厚度及钢筋笼标高符合设计要求。钢筋笼安装完毕,进行二次清孔。清孔后泥浆性能指针报现场监理工程师验收。
问题补充:

  • 匿名
2013-05-23 12:21:38
Installation of the reinforcement cage to be careful in ensuring the protection of concrete pile wall thickness and reinforcement cage house elevation design requirements. Reinforcement cage is installed, a second clearance hole. Chiang Khong performance indicators reported after the mud-site superv
  • 匿名
2013-05-23 12:23:18
We must seriously to install steel cages in piles, guarantee protection on behalf of wall thickness and reinforcement cages with Elevation design requirements. steel cage installed, and a 2th-hole. After the winding hole mud performance pointer reported on-site supervision engineers acceptance.
  • 匿名
2013-05-23 12:24:58
The reinforcing cage installment must to, guarantee earnestly the pile wall tong protection room thickness and the reinforcing cage elevation conform to the design requirement.The reinforcing cage installment finished, carries on two unvoiced aspirated consonants holes.After the clear hole the mud p
  • 匿名
2013-05-23 12:26:38
Reinforcement cage installed to seriously to ensure concrete pile wall thickness and level of reinforcement cage for protection housing comply with design requirements. Reinforcing cage is installed, for the second hole of the Qing dynasty. Clearance hole slip properties pointer site supervision eng
  • 匿名
2013-05-23 12:28:18
Reinforcement cage installed to seriously to ensure concrete pile wall thickness and level of reinforcement cage for protection housing comply with design requirements. Reinforcing cage is installed, for the second hole of the Qing dynasty. Clearance hole slip properties pointer site supervision eng
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭