求翻译:本试验是在柴油机、风冷散热装置、发电机和高压开关柜等主要部件检查验收合格,并且在柴油发电机组总组装完毕,经检查验收合格后进行是什么意思?

待解决 悬赏分:1 - 离问题结束还有
本试验是在柴油机、风冷散热装置、发电机和高压开关柜等主要部件检查验收合格,并且在柴油发电机组总组装完毕,经检查验收合格后进行
问题补充:

  • 匿名
2013-05-23 12:21:38
This test is in the diesel engine, air-cooling devices, generators and high voltage switchgear and other major parts inspection and acceptance, and diesel generator sets in the total assembly is completed, after acceptance by the inspection
  • 匿名
2013-05-23 12:23:18
The pilot is in diesel engines, air cooled heat sink, generators and high-voltage switchgear, and other major components check acceptance, and the diesel power generators have been assembled, the check and acceptance for qualified after
  • 匿名
2013-05-23 12:24:58
This experiment is in the diesel engine, the forced-air cooling heat dissipating arrangement, the generator and the high-pressured switch cabinet and so on the major component inspection approval is qualified, and always assembles in the diesel oil power set finished, qualified carries on after the
  • 匿名
2013-05-23 12:26:38
This test is in diesel engines, cooling devices, generators and high-voltage switch cabinet, and other major components check acceptance, and diesel generators always fully assembled, the check acceptance after passing a motion for
  • 匿名
2013-05-23 12:28:18
This test is in diesel engines, cooling devices, generators and high-voltage switch cabinet, and other major components check acceptance, and diesel generators always fully assembled, the check acceptance after passing a motion for
 
 