当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Although the company only added 169MW of new capacity in 1H14, we believe the total new capacity addition this year would only be a bit short of management’s expectations (Company expects to add 1.9GW, we estimate 1.7GW), since as of end of June 2014, HNR’s capacity under-construction was at a high level of 2.1GW. We 是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Although the company only added 169MW of new capacity in 1H14, we believe the total new capacity addition this year would only be a bit short of management’s expectations (Company expects to add 1.9GW, we estimate 1.7GW), since as of end of June 2014, HNR’s capacity under-construction was at a high level of 2.1GW. We
问题补充:

  • 匿名
2013-05-23 12:21:38
虽然该公司仅在1H14增加新产能169MW ,我们相信总新增产能此外,今年也只是有点短了管理层的预期(公司预计可新增1.9GW ,我们估计1.7GW ) ,自6月底
  • 匿名
2013-05-23 12:23:18
虽然公司只增加了新增效益169MW在1H14的,我们相信总新增效益加法今年只是有点短小管理的期望(公司期望增加1.9GW,我们估计1.7GW),因为自底2014年6月, HNR的容量建设中在高级2.1GW。我们相信大多数新增效益从6月将增加到9月期中考,公司目标给10GW带来总工作能力到2015年底。
  • 匿名
2013-05-23 12:24:58
虽然公司在1H14只增加了新的容量169MW,我们相信总新的容量加法今年只是的管理的期望位短小 (公司准备增加1.9GW,我们估计1.7GW),因为自底2014年6月, HNR的容量在之下建筑在高级2.1GW。 我们相信大多数新的容量将增加从6月到9月。 期中考,带来总工作能力的公司目标给10GW到2015年底。
  • 匿名
2013-05-23 12:26:38
虽然该公司只在 1 H 14 中添加 169MW 新的能力,我们相信总新增加的容量今年只会一点,达到管理层的期望公司预计,添加 1.9GW 我们估计 1.7GW),因为截至 2014 年 6 月结束,谐的能力不足的施工是在高水平的 2.1GW。我们相信大部分的新能力将从 6 月到 9 月补充说。中期,公司的目标,使总 2015年年底营运能力到 10GW。
  • 匿名
2013-05-23 12:28:18
虽然公司仅在 1H14 中添加新能力的 169MW,我们相信总数新能力增加今年仅会有点缺乏管理的预期 ( 公司期望添加 1.9GW,我们估计 1.7GW),从那以后截至 6 月末 2014 年, HNR 的能力正在建设中在 2.1GW 的一种高水平。我们相信,大部分新能力会从 6 月到 9 月中期被添加,公司在 2015 年结束之前将总数运行能力带给 10GW 的目标。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭