当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:拧入节流螺堵时,应涂上螺纹紧固胶,紧固胶不能堵塞节流小孔,涂胶工序应在组装组件时完成.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
拧入节流螺堵时,应涂上螺纹紧固胶,紧固胶不能堵塞节流小孔,涂胶工序应在组装组件时完成.
问题补充:

  • 匿名
2013-05-23 12:21:38
Screwed into the throttle screw plug should be coated with rubber thread fastening, fastening adhesive can not plug the hole cutting, gluing and assembly of components in the process should be completed.
  • 匿名
2013-05-23 12:23:18
Cutting screwing snails when plugging should be coated fasteners threaded fastener plastic, plastic does not plug throttling hole, coating process should be completed when the assembled components.
  • 匿名
2013-05-23 12:24:58
Installs when the throttle spiral stops up, should spread the thread fastening rubber, the tight rubber cannot stop up the throttle eyelet, spreads the rubber working procedure to be supposed in to assemble time the module completes.
  • 匿名
2013-05-23 12:26:38
Into the throttle when the plug should be coated with threaded fastening adhesives, fastening plastic not jam the throttle small holes, gluing process should be completed when assembling a component.
  • 匿名
2013-05-23 12:28:18
Into the throttle when the plug should be coated with threaded fastening adhesives, fastening plastic not jam the throttle small holes, gluing process should be completed when assembling a component.
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭