当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Scope of work under this section covers the provision of labour, tools ,plants, material and performance of work necessary for the detailed design and engineering, manufacture, quality assurance, quality control, shop assembly, shop testing, transportation, delivery at site, site storage and preservation, erection, tes是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Scope of work under this section covers the provision of labour, tools ,plants, material and performance of work necessary for the detailed design and engineering, manufacture, quality assurance, quality control, shop assembly, shop testing, transportation, delivery at site, site storage and preservation, erection, tes
问题补充:

  • 匿名
2013-05-23 12:21:38
根据本条的工作范围包括提供劳务,工具,植物,材料和工作实绩的详细设计和工程设计,制造,质量保证,质量控制,车间装配,店测试,运输,交付网站,网站所必需的贮藏保鲜,安装,测试和调试,性能测试,现场验收测试,培训的雇主人员,移交两年发包方和保证的PLCC设备与电话交换机,电缆和所有配件完成,使系统的完整和值得一个无故障运行。
  • 匿名
2013-05-23 12:23:18
(名) 范围, 广度, 机会
  • 匿名
2013-05-23 12:24:58
工作的范围在这个部分之下包括劳方供应、工具、植物、工作材料和表现必要为详细设计和工程学,制造、质量管理、质量管理、商店汇编、商店测试,运输,交付在站点、站点存贮和保存,架设,测试和委任,性能试验,领域验收测试,训练雇主人员,移交到雇主和保证对于二年, PLCC设备完全用电话总机、缆绳和所有辅助部件为使系统完全和为担保无困难操作。
  • 匿名
2013-05-23 12:26:38
根据本条的工作范围包括提供劳工、 工具、 植物、 材料和工作所需的详细的设计和工程、 制造、 质量保证、 质量控制、 装配车间、 店测试、 运输、 站点、 站点存储和保存、 安装、 测试和调试、 性能测试、 现场验收测试、 雇主人员,交给的雇主和保证两年的培训在交货的性能有引线的设备完成电话交换机、 电缆及所有配件制作完整的系统,值得麻烦的自由运作。
  • 匿名
2013-05-23 12:28:18
根据本条的工作范围包括提供劳工、 工具、 植物、 材料和工作所需的详细的设计和工程、 制造、 质量保证、 质量控制、 装配车间、 店测试、 运输、 站点、 站点存储和保存、 安装、 测试和调试、 性能测试、 现场验收测试、 雇主人员,交给的雇主和保证两年的培训在交货的性能有引线的设备完成电话交换机、 电缆及所有配件制作完整的系统,值得麻烦的自由运作。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭