当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:这个11.007.02轴可以按照图纸生产,样品需要重新打样,大概要1个星期左右,但是已经生产的12万库存必须先用完再用新的产品是什么意思?

待解决 悬赏分:1 - 离问题结束还有
这个11.007.02轴可以按照图纸生产,样品需要重新打样,大概要1个星期左右,但是已经生产的12万库存必须先用完再用新的产品
问题补充:

  • 匿名
2013-05-23 12:21:38
STAC you reply to this 11.007.02 axis can follow the production drawings, samples need to re-proofing, probably about one week, but has produced 120,000 new stock must be re-used products
  • 匿名
2013-05-23 12:23:18
Your reply to the 11.007 STAC .02 shaft can be produced in accordance with drawings, samples need to be re-proofing, which is about 1 weeks, but about 120,000 have been produced in inventory must be first-come-first-served basis, we get back to the new products use
  • 匿名
2013-05-23 12:24:58
You reply for STAC this 11.007.02 axes may defer to the blueprint production, the sample need to pull, probably takes about for 1 week, but already produced 120,000 stocks had to use up first uses the new product again
  • 匿名
2013-05-23 12:26:38
You reply to STAC 11.007.02 axis according to drawings, samples require proof, about 1 week or so, but had produced 120,000 of the inventory must be run out with the new product
  • 匿名
2013-05-23 12:28:18
You reply to STAC 11.007.02 axis according to drawings, samples require proof, about 1 week or so, but had produced 120,000 of the inventory must be run out with the new product
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭