当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:per Alberta regulation a manufacturer must get register design before making a pressure component. Any modification to design must be registered as well. I cannot advise you how critical the modification are before I have reviewed the design. The review is scheduled, the place in the line for your resubmission is 78-7是什么意思?

待解决 悬赏分:1 - 离问题结束还有
per Alberta regulation a manufacturer must get register design before making a pressure component. Any modification to design must be registered as well. I cannot advise you how critical the modification are before I have reviewed the design. The review is scheduled, the place in the line for your resubmission is 78-7
问题补充:

  • 匿名
2013-05-23 12:21:38
每阿尔伯塔省监管制造商必须获得制造压力组件之前注册的设计。
  • 匿名
2013-05-23 12:23:18
每个亚伯大章程制造商必须在做压力组分前得到记数器设计。必须登记对设计的所有修改。我不可能劝告您多么重要修改是,在我回顾了设计前。回顾预定,线的地方于您的重新提交是78-79从200在线的设计。
  • 匿名
2013-05-23 12:24:58
每个亚伯大章程制造商必须在做压力组分之前得到记数器设计。 必须登记对设计的所有修改。 我不可能劝告您多么重要修改是,在我回顾了设计之前。 回顾在线在线预定,地方于您的重新提交是78-79从200设计。
  • 匿名
2013-05-23 12:26:38
每个制造商必须得到的艾伯塔省章程进行压力组件之前注册设计。设计的任何修改必须注册了。我不能建议你如何重要修改是之前我已经复习了设计。已安排评审,在您重新提交的行的地方是从行中 200 设计 78-79。
  • 匿名
2013-05-23 12:28:18
每阿尔伯达规则一个制造商必须 在制作一个压力组件之前获取登记簿设计。设计的任何更改必须也被注册。我不能建议你多重要更改以前是我查看了设计。审核被安排,在对于你的重新屈服的线中的地方是从 200 的 78-79 线中的设计。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭