当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:During the regular audit conducted by CJ, 3 TCP raw metal materials deviation were found, these materials have been used since the beginning and believed these were clarified and approved by GE, however, due to the staff turnover, the written evidence was not found, hence, SDR’s were submitted for documenting these dev是什么意思?

待解决 悬赏分:1 - 离问题结束还有
During the regular audit conducted by CJ, 3 TCP raw metal materials deviation were found, these materials have been used since the beginning and believed these were clarified and approved by GE, however, due to the staff turnover, the written evidence was not found, hence, SDR’s were submitted for documenting these dev
问题补充:

  • 匿名
2013-05-23 12:21:38
在由终审法院首席法官进行定期审计, 3 TCP金属原材料偏差被发现,这些材料已经从一开始使用,并且认为这些被澄清,并批准由GE ,不过,由于人员流失,找不到书面证据,
  • 匿名
2013-05-23 12:23:18
在CJ举办的正规兵审计期间, 3找到TCP未加工的金属材料偏差,这些材料从起点使用了并且相信这些是由GE澄清的并且批准,因此,然而,由于人员周转,未找到书面证据SDR'S为提供这些偏差递交了,尽快请配置SDR,并且告诉我,如果您有任何问题,感谢。
  • 匿名
2013-05-23 12:24:58
在CJ举办的正规兵审计期间, 3 TCP未加工的金属材料偏差被发现了,使用了这些材料,自从起点和相信这些是由GE澄清的并且批准,然而,由于人员周转,因此,书面证据未被发现SDR'S为提供这些偏差递交了,尽快请配置SDR,并且告诉我,如果您有任何问题,感谢。
  • 匿名
2013-05-23 12:26:38
由 CJ,3 TCP 金属原材料偏差被发现,这些材料已自开始以来使用和相信这些澄清和批准的 GE,然而,由于工作人员更替,进行定期审核过程中的书面的证据找不到,因此,特别提款权的提交记录这些偏差、 请尽快,处置特别提款权和让我知道是否你有任何问题谢谢你。
  • 匿名
2013-05-23 12:28:18
在固定的审计期间由 CJ 进行的, 3 TCP 未加工的金属材料偏离被找到,这些材料被使用了自从起点和相信,这些被阐明和被 GE 批准,然而,由于职员流通,书面证据未找到,因此, SDR 的为了记载这些偏离被提交,请安排 SDR asap,告诉我如果你有任何问题,谢谢。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭