求翻译:No Party instructions , B can not make any changes to the project . B unauthorized changes to the design due to the cost incurred and the resulting direct and indirect losses of Party A, Party B shall bear , the duration of the delay will not be postponed. Party B fault, breach of contract or liability resulting from B是什么意思?

待解决 悬赏分:1 - 离问题结束还有
No Party instructions , B can not make any changes to the project . B unauthorized changes to the design due to the cost incurred and the resulting direct and indirect losses of Party A, Party B shall bear , the duration of the delay will not be postponed. Party B fault, breach of contract or liability resulting from B
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
Nenhuma parte instruções, B não pode fazer quaisquer alterações ao projecto. B as alterações não autorizadas para o projeto devido ao custo incorrido e o resultante das perdas diretas e indiretas da parte A, Parte B deve conter, a duração do atraso não será adiada. Parte B avaria, quebra de contrato
  • 匿名
2013-05-23 12:24:58
Nenhuma instrução do partido, B não pode fazer nenhumas mudanças ao projeto. As mudanças desautorizadas de B ao projeto devido ao custo incorrido e a resultar perdas diretas e indiretas do partido A, partido que B carregará, a duração do atrasam não postponed. A falha do partido B, a ruptura de cont
  • 匿名
2013-05-23 12:26:38
Sem instruções de festa, B não pode fazer quaisquer alterações ao projecto. B não autorizado altera para o projeto devido ao custo incorrido e a resultante direta e perdas indirectas de partido A, B do partido devem conter, a duração do atraso não será adiada. Culpa do partido B, violação de contrat
  • 匿名
2013-05-23 12:28:18
没有党指示, B 不可能对项目作出任何更改。B 对由于费用的设计的未被授权的变化招致和党 A,党 B 的发生直接和间接的损失将生,延迟的持续不将被延迟。党 B 错误,违反合同或因 B 而产生的责任,然后任何附加成本由这样的变化造成将被生党
 
 