求翻译:(a) the order in which the Sub-Contractor intends to carry out the Generating Equipment Works, including the anticipated timing of each stage of design, Sub-Contractor's Documents, procurement, manufacture, shop testing, inspection, transportation and delivery to the Site, construction, embedding in concrete, erection,是什么意思?

待解决 悬赏分:1 - 离问题结束还有
(a) the order in which the Sub-Contractor intends to carry out the Generating Equipment Works, including the anticipated timing of each stage of design, Sub-Contractor's Documents, procurement, manufacture, shop testing, inspection, transportation and delivery to the Site, construction, embedding in concrete, erection,
问题补充:

  • 匿名
2013-05-23 12:21:38
(一),其中分包商拟开展发电设备工程,包括设计的每一个阶段,子承包商文件,采购,制造,车间测试,检验,运输和交付到本网站的预期时间顺序
  • 匿名
2013-05-23 12:23:18
(a)转承包商打算执行发电设备的命令运作,包括设计、转承包商的文件、获得、制造、商店测试、检查、运输和交付到站点,建筑每个阶段被期望的时间,埋置在混凝土、架设,测试,委任和试运行;
  • 匿名
2013-05-23 12:24:58
(a) 转承包商打算执行发电设备的命令运作,包括设计、转承包商的文件、获得、制造、商店测试,检查、运输和交付,建筑每个阶段被期望的时间对站点的,埋置在混凝土,架设,测试,委任和试验操作;
  • 匿名
2013-05-23 12:26:38
(a) 分包商打算进行发电设备工程,包括设计、 分包商的文件、 采购、 制造、 商店测试、 检验、 运输和交货到工地,建筑、 嵌入混凝土、 安装、 测试、 调试和试运行 ; 在每个阶段的预期时间安排的顺序
  • 匿名
2013-05-23 12:28:18
(a) 次序,其中分销商打算进行生成装备工作,包括每阶段的设计的预期的时间选择,分销商的文件,获得,制作,商店测试,检验,运输和发送到地点,建造,嵌入混凝土,直立,检查,委托和审讯操作;
 
 