当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Oil production forecast is based on the notional development scenario for OPL 2010 outlined in the text above. Production profiles were prepared based on ultimate oil recovery estimated for each discovered accumulation. Recoverable volumes classified as Contingent Resources have been considered separately from Prospect是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Oil production forecast is based on the notional development scenario for OPL 2010 outlined in the text above. Production profiles were prepared based on ultimate oil recovery estimated for each discovered accumulation. Recoverable volumes classified as Contingent Resources have been considered separately from Prospect
问题补充:

  • 匿名
2013-05-23 12:21:38
石油产量的预测是基于名义开发方案为OPL 2010年以上的文字概括。
  • 匿名
2013-05-23 12:23:18
石油生产展望根据在上面文本2010概念上的发展情景概述的OPL的。生产外形根据估计的最后油补救准备了为每被发现的储积。为意外资源分类的恢复性的容量分别地被考虑了与预期资源。生产外形未为预期资源引起。
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
石油生产预测基于上述文本中所概述的 OPL 2010 的名义发展方案。生产型材制备了基于最终采收率估计为每个发现的积累。从潜在资源分别考虑了归类为特遣队资源可采卷。没有生产配置文件生成的潜在资源。
  • 匿名
2013-05-23 12:28:18
被预测的油生产为了 OPL 依据概念的发展设想 2010 年略述在文本中大于。生产描根据被估计的最后的油恢复准备每被发现的聚积。可恢复的卷归类为可能发生的资源从预期的资源单独被考虑了。没有生产描为预期的资源被生成。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭