当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Costs for the assumed notional development concept for the Ine discovery have been estimated on the same basis as for the Uwem discovery. However it is recognized that as the majority of the Ine structure is off-block, GDPC is unlikely to become the operator.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Costs for the assumed notional development concept for the Ine discovery have been estimated on the same basis as for the Uwem discovery. However it is recognized that as the majority of the Ine structure is off-block, GDPC is unlikely to become the operator.
问题补充:

  • 匿名
2013-05-23 12:21:38
针对国家统计局发现的假定名义发展观成本估计在同一基础上的Uwem发现。
  • 匿名
2013-05-23 12:23:18
假设的概念上的发展概念的费用Ine发现的估计根据依据和一样为Uwem发现。然而被认可,因为Ine结构的多数是块, GDPC是不太可能适合操作员。
  • 匿名
2013-05-23 12:24:58
费用为假设的概念上的发展概念为Ine发现估计根据依据和一样为Uwem发现。 然而它被认可, Ine结构的多数阻拦, GDPC是不太可能适合操作员。
  • 匿名
2013-05-23 12:26:38
Ine 发现的假定名义发展概念的成本估计按 Uwem 发现的相同。然而它是认识到作为 Ine 结构的大部分是掉块,总局不太可能成为运营商。
  • 匿名
2013-05-23 12:28:18
为 Ine 发现为假定概念的发展概念花费在相同的基础上被估计了至于 Uwem 发现。然而,是承认那当 Ine 结构的多数是萧条街区的, GDPC 是不大可能的成为操作员。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭