当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:resourced in a timely fashion. The full field development of the Uwem accumulation assumes four oil production wells and one gas injection wells. The wells assumed to be deviated with dual completions which would allow producing from two Uwem intervals simultaneously. The first oil in OPL 2010 is assumed in Uwem in 1Q 是什么意思?

待解决 悬赏分:1 - 离问题结束还有
resourced in a timely fashion. The full field development of the Uwem accumulation assumes four oil production wells and one gas injection wells. The wells assumed to be deviated with dual completions which would allow producing from two Uwem intervals simultaneously. The first oil in OPL 2010 is assumed in Uwem in 1Q
问题补充:

  • 匿名
2013-05-23 12:21:38
资源及时。
  • 匿名
2013-05-23 12:23:18
及时地resourced。Uwem储积的全磁场发展假设四口石油生产井和一气体注入井。井假设偏离与将准许同时生产由两Uwem间隔时间的双重完成。在OPL的第一油2010年在1Q的Uwem假设2015年。所有伴生气在Uwem通过气体注入井将被配置。
  • 匿名
2013-05-23 12:24:58
及时地resourced。 Uwem储积的全磁场发展假设四口石油生产井和一气体注入井。 假设的井偏离以将准许同时生产由二Uwem间隔时间的双重完成。 第一油在OPL 2010年在Uwem在1Q假设2015年。 所有伴生气在Uwem通过气体注入井将被配置。
  • 匿名
2013-05-23 12:26:38
及时的资源。Uwem 积累的全域发展假设四个石油生产井和一注气井。假定偏离与双落成,这将允许同时从两个 Uwem 间隔生产井。OPL 2010 年第一次石油假定在 Uwem 1Q 2015年。好在 Uwem 中的所有相关的气体通过气体注入,将释放。
  • 匿名
2013-05-23 12:28:18
在一种适时的时尚中重新发源。Uwem 聚积的完全现场的发展假定四口油生产井和一口气体注射井。井假定被利用会从两个 Uwem 间隔同时允许生产的双完成背离。在 OPL 的第一油 2010 年在 1Q 中在 Uwem 中被假定 2015 年。在 Uwem 的所有被联系的气体将通过气体注射剂好地被处理。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭